On Monday, October 21, repair works will start in the Romanian section of the Danube Bridge linking Ruse and Giurgiu, the Romanian authorities report. The facility will not be closed completely, BNR correspondent in Ruse, Asya Pencheva, informed. According to preliminary estimates, the repair works should be completed by December 1.
We recall that in July this year, a phased overhaul of the Danube bridge near Ruse started without stopping traffic. The repairs are expected to be completed for a period of two years.
On the occasion of the Aviation and Air Force Day on October 16, at 09:00, flowers and wreaths will be laid at the Aviators Monument near the National Assembly in the capital city, the Ministry of Defense reports. The solemn..
On Thursday , the lowest temperatures will be between 4 and 9°C; in Sofia – about 4°C. During the day, there will be significant cloudiness over many regions of the country. There will be light rainfall in places in the southeastern..
Between January and September 2025, Bulgaria’s capital recorded a 10% increase in tourist arrivals and a 6% rise in overnight stays compared with the same period in 2024, according to data from the Unified Tourist Information System (ESTI). The municipal..
On Saturday, minimum temperatures will range from 8 to 13°C , around 9°C in Sofia. It will be mostly cloudy with rain in many areas. There will be..
+359 2 9336 661