Podcast in English
Text size
Bulgarian National Radio © 2024 All Rights Reserved

Unit 6 of Kozloduy NPP connected to the national grid after annual maintenance

Photo: kznpp.org

The planned annual maintenance of Unit 6 of Bulgaria's only NPP, Kozloduy, has been completed. The unit was connected to the national grid at 10:07 following an inspection by the Nuclear Regulatory Agency. In addition to the repairs made to improve safety, the reactor was refueled with fresh nuclear fuel. 

The unit's load will be gradually increased as required.

Unit 5 of the Kozloduy NPP is operating normally.



Последвайте ни и в Google News Showcase, за да научите най-важното от деня!
Listen to the daily news from Bulgaria presented in "Bulgaria Today" podcast, available in Spotify.

More from category

Sofia Christmas festival will kick off tonight in front of National Palace of Culture

The Sofia Christmas Festival will open tonight in the park in front of the National Palace of Culture in the heart of Sofia . The third edition of the festival starts at 6.30 pm with a rich program and attractions - а Ferris wheel, a carousel and..

published on 11/22/24 4:24 PM

MPs fail to elect a Speaker of Parliament at fifth attempt

Yet another, already fifth attempt by MPs to elect a Parliamentary Speaker has failed. Four candidates were put to the vote - Natalia Kiselova from BSP-Unified Left, Petar Petrov from Vazrazhdane, Raya Nazaryan from GERB and Silvi Kirilov from ITN...

published on 11/22/24 3:40 PM

Heavy traffic of truck near Danube Bridge at the border with Romania

The traffic of trucks in the area of the Danube Bridge at the border with Romania is heavy.  This situation is expected to continue over the weekend as the trucks that were waiting at the Kapitan Andreevo crossing at the Bulgarian-Turkish border for..

published on 11/22/24 3:36 PM