Podcast in English
Text size
Bulgarian National Radio © 2025 All Rights Reserved

Unit 6 of Kozloduy NPP connected to the national grid after annual maintenance

Photo: kznpp.org

The planned annual maintenance of Unit 6 of Bulgaria's only NPP, Kozloduy, has been completed. The unit was connected to the national grid at 10:07 following an inspection by the Nuclear Regulatory Agency. In addition to the repairs made to improve safety, the reactor was refueled with fresh nuclear fuel. 

The unit's load will be gradually increased as required.

Unit 5 of the Kozloduy NPP is operating normally.



Последвайте ни и в Google News Showcase, за да научите най-важното от деня!
Listen to the daily news from Bulgaria presented in "Bulgaria Today" podcast, available in Spotify.

More from category

Leva-to-euro exchange jumps by 43% in one week

The National Revenue Agency is inspecting currency exchange offices due to increased interest in buying euros . Within just one week, the exchange of Bulgarian leva into euros increased by 43%, the agency’s director, Rumen Spetsov, announced in..

published on 6/25/25 5:33 PM

Kiril Petkov resigns as co-chair of "We Continue the Change"

Kiril Petkov announced at a briefing that he is taking political responsibility and resigning as co-chair of "We Continue the Change" (part of the PP-DB coalition, which has the second largest number of MPs in the National Assembly)..

published on 6/25/25 3:59 PM

Bulgaria has a palette of advantages, little known to Japanese companies

A Japan-Bulgaria business forum on the topic of "Infrastructure, Energy and Digitalization" was held in Sofia. "Bulgaria has a whole palette of advantages. However, they are little known in Japan. Our task is to provide much clearer..

published on 6/25/25 2:34 PM