The renovation of the Kulata border checkpoint has begun in connection with Bulgaria's upcoming entry into Schengen on January 1. There will be two lanes in each direction before the checkpoint. A new 200-meter lane is being built on Bulgarian territory at the entrance from Promachonas at the expense of the removed sidewalk. The opposite lane is also being widened by one metre, again at the expense of the sidewalk, reports BGNES. No commercial buildings have been demolished in the area where the new lane is being built.
The renovation is expected to be completed by December 31 and will ensure smoother passage for all vehicles after Bulgaria’s accession to Schengen. Traffic in the area of the checkpoint is being managed by Traffic Police officers until the completion of the construction.
The European Commission has announced that the EU will invest nearly €37.5 million in the construction and modernisation of six parking areas with a total of 816 spaces for heavy goods vehicles. According to BNR correspondent in Brussels Angelina..
86.4% of Bulgarians support the protests by young doctors and medical specialists calling for higher pay , while only 7.3% disapprove. 5.8% were unaware of the issue, while a small percentage found it difficult to answer. These are the results of an..
A day before the third motion of no confidence in Prime Minister Rosen Zhelyazkov’s cabinet was due to be voted on, the Velichie party submitted a fourth motion. Today, the National Assembly debated the no-confidence vote proposed by..
A new lane for heavy trucks over 12 tons will be opened at the Danube Bridge in Ruse, announced Ruse Regional Governor Dragomir Draganov. The initiative..
On July 7, the Bulgarian National Bank (BNB) puts into circulation a silver commemorative coin titled "175 Years Since the Birth of Ivan Vazov", BNB..
Gorna Oryahovitsa is the largest non-district town in Northern Bulgaria. It is located near Bulgaria’s old capital, Veliko Tarnovo, and is an important..
+359 2 9336 661