The official start of the work of the “Vitosha” tunnel boring machine for the expansion of Line 3 of the capital's metro to the "Slatina" district is on February 6. The machine will depart from the metro station at Tsarigradsko Shose Blvd. in the direction of the station next to the "Arena 8888 Sofia" hall and Sofia Tech Park. The machine weighs 1,600 tons and is about 86 meters long. It is planned to achieve an average progress of over 10 meters per day.

We recall that on January 28, the 27th anniversary of the opening of the first section of the metro was marked. Today, it already has three lines. 10 new stations are currently being built. The plans are for them to be ready in 2027. With them, the metro will take 46% of the daily passenger flow.
In parallel with the construction of the 10 new metro stations, preliminary studies are being carried out for future extensions of the metro to Studentski Grad and to the lower lift station of the Simeonovski lift.
Judges have opposed the introduction of a new antivirus agent on their computers. The magistrates fear that it could violate personal data protection rules and compromise the independence of the judiciary. In an official letter, the Bulgarian..
GERB leader Boyko Borisov said in Parliament that Bulgaria will become a member of the eurozone on January 1, regardless of protests organized by representatives of We Continue the Change Democratic Bulgaria (PP-DB). He was commenting on opposition..
Six countries, including Bulgaria, are at risk of non compliance with the EU fiscal framework in 2026. This is highlighted in the 2026 European Semester Autumn Package, adopted by the European Commission. Another 12 countries are urged to continue..
+359 2 9336 661