A tender for the design and construction of Terminal 3, pre-terminal space, transport hub and modernization of the existing Terminal 2 at Sofia's Vasil Levski Airport has been launched, the airport operator SOF Connect announced.
It will invest 230 million euros in the project with additional investments in equipment of 25.5 million euros. "This is the largest public infrastructure development project to be implemented in the country in the next five years," the company said. They expect that by 2031 Bulgaria will have a world-class airport, BTA has reported.
Editor: Miglena Ivanova
Publication in English: Al. Markov
Photo: SOF Connect
Plamen Dimitrov, president of Bulgaria’s largest trade union, the Confederation of Independent Trade Unions in Bulgaria (CITUB), has warned of a potential shortfall of around 17–18 billion leva (EUR 8.7–9.2 billion) in next year’s draft budget...
North Macedonian Prime Minister Hristijan Mickoski said his government will not unconditionally recognise Bulgarians in the country’s constitution. “Nobody has the right to expect this government to make constitutional changes unconditionally,” he told..
‘The Bulgarian Rectors’ Council has proposed the creation of Danube University Alliances,’ said Professor Miglena Temelkova, the Council's chair, at the ‘Days of Bulgaria in Kecskemét, Hungary’ forum. The idea is for the alliances to include..
The Bulgarian National Radio will host the 2025 Public Broadcasters International (PBI) Annual Conference . The prestigious forum will be held from..
On Saturday, minimum temperatures will range from 8 to 13°C , around 9°C in Sofia. It will be mostly cloudy with rain in many areas. There will be..
Bulgaria’s Minister of Justice Georgi Georgiev conferred in Brussels with the European Commission team responsible for the Resilience and Recovery Plan..
+359 2 9336 661