In recent weeks, the low level of the Danube has not impacted the normal operation of Bulgaria's sole nuclear power plant, Kozloduy, which comprises two units. This information was announced in a press release by the plant.
On 4 July 2025, the water level at the plant was measured at 21.5 metres, which is 53 centimetres higher than the 20.97 metres recorded in late summer 2003.
To ensure the reliable operation of the units, Kozloduy NPP has its own shore pumping station equipped with 34 powerful pumps. The plant stressed that the facility was designed to provide water even at the lowest ever recorded river level, based on data from a century of Danube studies.
Editor: Miglena Ivanova
Posted in English by E. Radkova
Finance Minister Temenuzhka Petkova said in Brussels, at the official ceremony for signing the final documents marking Bulgaria’s entry into the eurozone and the adoption of the euro on 1 January 2026, that the country will remain a firm supporter of..
Following the Council of the EU's and the European Parliament's decision on Bulgaria's accession to the eurozone, the country is entering the final phase of preparation, said Dimitar Radev , Governor of the Bulgarian National Bank (BNB), in an interview..
The EU Council on Economic and Financial Affairs (ECOFIN) unanimously approved the final three acts enabling Bulgaria’s accession to the eurozone. Earlier, MEPs in Strasbourg had adopted the report supporting Bulgaria’s admission to the euro area...
Full EU membership is neither the end of the story nor a solution to all problems. Realism and accurate self-assessment must guide important decisions,..
The ministers of agriculture of Bulgaria, Hungary, Poland, Slovakia and Romania have signed a joint declaration concerning the agricultural aspects of..
Bulgaria reacted swiftly to a forest fire near the town of Kriva Palanka, North Macedonia, which is located near the Bulgarian -North Macedonian border...
+359 2 9336 661