BDZ will start purchasing new railcars, the Executive Director of Bulgarian State Railways Holding Vladimir Vladimirov said on Sunday. This procedure will start at the end of September 2017. The customer requirements will be taken into consideration as well. The technological deadline for supply and commissioning is 24 months, but we can also rent some trains earlier, said Mr Vladimirov. Until then the construction of most high-speed routes must be completed. Currently the state cannot afford to make large-scale and quick investments in this sector, but it should at least make some moderate investments for a long period of time, in order to saturate the railway network with modern railcars and trains, Vladimir Vladimirov contends.
Two billion euros in additional state guarantees and a concession of the Bulgarian Sports Totalizator are part of changes to the draft budget for 2026, submitted between the first and second readings. The change that increases the..
The increase in the minimum wage is supported by 54.1% of Bulgarians. 1/3 of respondents believe that the minimum wage should be equal to the living wage. This is indicated by the results of a representative survey by the Myara..
“We see a rational plan for a quick peace from President Donald Trump, according to which the situation on the battlefield is developing extremely unfavorably for Ukraine, and he is trying to prevent a worse scenario and additional casualties,”..
+359 2 9336 661