Podcast in English
Text size
Bulgarian National Radio © 2025 All Rights Reserved

Gas hub feasibility study starts

Photo: BGNES

Bulgarian gas operator Bulgartransgaz and Bulgarian-Swiss consortium AF-EMG Consult have signed a contract for the feasibility study of the planned Balkan gas hub.

Within a period of 40 days the consortium will present an interim report, while a comprehensive survey will be prepared in a period of 110 days. The feasibility study will detail the commercial and technical viability of the project and will identify the exact business model for its realization, as well as target markets, demand and supply sources of natural gas.


Последвайте ни и в Google News Showcase, за да научите най-важното от деня!
Listen to the daily news from Bulgaria presented in "Bulgaria Today" podcast, available in Spotify.

More from category

MPs override President's veto on changes to Investment Promotion Act

The majority in parliament overcame the president's veto on the Investment Promotion Act. The bill was passed in second reading on October 24, but President Rumen Radev vetoed parts of it, arguing that the proposed rules specifically..

published on 11/6/25 4:41 PM

Construction of railway connection between Sofia and Skopje resumes

Deputy Prime Ministers and Ministers of Transport Grozdan Karadzhov and Aleksandar Nikoloski signed an agreement in Gyueshevo for the construction of a railway tunnel between Bulgaria and the Republic of North Macedonia. The facility..

published on 11/6/25 3:04 PM
Natalia Nikolova

Police neutralises channel for trafficking illegal migrants from Turkey to Serbia

The police have neutralized an organized crime group that transported migrants from Burgas through Sofia to the Serbian border, Sofia District Prosecutor Natalia Nikolova said at a briefing. She indicated that 13 addresses were..

published on 11/6/25 1:25 PM