Podcast in English
Text size
Bulgarian National Radio © 2025 All Rights Reserved

Gas hub feasibility study starts

Photo: BGNES

Bulgarian gas operator Bulgartransgaz and Bulgarian-Swiss consortium AF-EMG Consult have signed a contract for the feasibility study of the planned Balkan gas hub.

Within a period of 40 days the consortium will present an interim report, while a comprehensive survey will be prepared in a period of 110 days. The feasibility study will detail the commercial and technical viability of the project and will identify the exact business model for its realization, as well as target markets, demand and supply sources of natural gas.


Последвайте ни и в Google News Showcase, за да научите най-важното от деня!
Listen to the daily news from Bulgaria presented in "Bulgaria Today" podcast, available in Spotify.

More from category

Bulgaria insists on building bridges over the Danube near Silistra and Nikopol

More bridges over the Danube are not just a bilateral issue between Bulgaria and Romania – they are a strategic priority for the prosperity of the entire EU and for our collective security within NATO.  This was emphasized by Deputy Prime Minister..

published on 11/6/25 8:46 AM

Bulgaria and North Macedonia sign an agreement on building a railway tunnel between the two countries

Today, the deputy PMs and ministers of transport of Bulgaria and North Macedonia Grozdan Karadjov and Aleksandar Nikoloski will sign an agreement on the preparation, construction and operation of a cross-border railway tunnel between the two..

published on 11/6/25 7:15 AM

Ex-PM Boyko Borisov: Delyan Peevski is unfairly sanctioned under the Magnitsky Act

GERB leader Boyko Borisov has told the media that he personally participated in talks with American representatives on the lifting of the Magnitsky sanctions against Bulgarian citizens. He said that he also spoke on the subject with David Cameron while..

published on 11/5/25 9:04 PM