Executive Director of AES, one of the US-owned power plants in Bulgaria’s Maritza East complex, Ivan Tsankov, has told the Bulgarian National Radio that any change in the long-term contracts for buying produced energy should be approved by creditor banks.
This, according to Tsankov, would take a long time. The company has made planned investments, but debts towards have not been paid yet.
Last week it became clear that the government was willing to comply with the call of employers' organizations, who want contracts with the two US-owned plants terminated. According to employers this could happen within a few weeks.
President Rumen Radev, who is paying an official visit to Vietnam, delivered a lecture on the occasion of the 75 th anniversary since the establishment of diplomatic relations between the two countries at the Diplomatic Academy of the Ministry of..
“We find the proposal of Boyko Borissov as premier of Bulgaria absolutely unacceptable, we are not going to be involved in any trading in positions.” This is the answer We Continue the Change/Democratic Bulgaria (PP/DB) gave to the proposal by GERB..
During the night, the weather will be predominantly clear and calm. There will be fog or low clouds before midday in parts of the lowlands, valleys and around water basins. Minimum temperatures minus 4-1° C., for Sofia around minus 2° C. On..
According to unofficial information, the Hungarian Presidency of the Council of the EU has drafted a decision for the full admission of Bulgaria and..
The first marble statue discovered in the ancient city of Heraclea Sintica on 3 July, is probably of Lucius – grandson of Roman Emperor Octavian..
During the night, the weather will be predominantly clear and calm. There will be fog or low clouds before midday in parts of the lowlands, valleys..
+359 2 9336 661