Podcast in English
Text size
Bulgarian National Radio © 2024 All Rights Reserved

European experts propose action plan for preservation of Buzludzha Monument

Photo: flickr.com

Europe Nostra, a leading organization for cultural heritage preservation and the Institute at the European Investment Bank have published a report on the Bulgarian Buzludzha Memorial House dating back to the times of socialism. The building was declared one of the 7 most endangered sites of cultural heritage in Europe in 2018 under the "Buzludzha Project" Foundation nomination. According to European experts, "the Buzludzha monument is a unique engineering achievement" and a "masterpiece of architecture of obvious European importance", which must stand "beyond future political controversy." The report proposes that the building be declared a cultural heritage monument of national importance. Its recovery would cost about EUR 7.5 million and could be financed under the European structural funds.




Последвайте ни и в Google News Showcase, за да научите най-важното от деня!
Listen to the daily news from Bulgaria presented in "Bulgaria Today" podcast, available in Spotify.

More from category

Bulgaria's 33rd Polar Expedition leaves for Antarctica

Today the 33rd Bulgarian Polar Expedition left the port of Varna for Antarctica. For the third year in a row, Bulgarian polar explorers will sail on the military research vessel "St Cyril and Methodius". This time, two cadets from Romania will be on..

published on 11/7/24 8:40 AM

Forum in Sofia examines strategies to combat misinformation

From today until 9 November, the Central Military Club in Sofia will host the Sofia Information Integrity Forum 2024 . The event will bring together world-leading experts in various fields to discuss the latest technological advances and strategies in..

published on 11/7/24 7:15 AM

Poland will repair six engines of Bulgaria’s MiG-29 jets

The Bulgarian Ministry of Defense has signed a contract with Polish state company Wojskowe Zakłady Lotnicze Nr 2 S.A. for major repair of six MiG-29 aircraft engines.  The maximum period for carrying out the repair of each engine will be no more..

published on 11/6/24 5:53 PM