After completion of work on the modernization of Unit 5 of the Kozloduy NPP for upgrading power performance up to 104 percent, carried out during the scheduled annual maintenance for this year, final testing is set for 13 and 14 July 2019.
The aim is to confirm readiness of the systems and equipment for performance in the conditions of upgraded power capacity in different modes of operation. A similar test programme was applied to Unit 6 of Kozloduy NPP in 2017. It now functions at full capacity - 1040 MWe.
Monday will be mostly sunny with scattered high clouds. The lowest temperatures will be between 0° and 5°C; in Sofia - about 1°C, and the highest will reach between 13° to 18°C; in Sofia - about 14°C. In the mountains it will..
On the first day of the 51st parliament, ITN will initiate the collection of signatures for submitting a complaint to the Constitutional Court concerning the partial cassation of the elections, party leader Slavi Trifonov announced on..
Vazrazhdane calls for a recount of the votes from the early parliamentary elections, party leader Kostadin Kostadinov has told BNR. "It will perhaps show that there are protocols that do not match with the contents of the bags with..
Today, 3 November, is International Day for Biosphere Reserves, declared by UNESCO’s Man and the Biosphere programme. On this occasion, as of the second..
Today, Vice President Iliana Iotova is opening the exhibition “Ancient Thrace and the Classical World: Treasures from Bulgaria, Romania, and Greece” at..
In the elections on October 27 this year there were problems in both phases of the process - when the votes were submitted and when they..
+359 2 9336 661