The extension of the Turkish Stream gas pipeline will pass through Bulgaria, not Greece, Russia’s Energy Minister Alexander Novak told journalists today at the sitting of the Russia-Turkey Intergovernmental Commission on Trade and Economic Cooperation in Antalya. The gas pipeline which has to connect Russia and Turkey via the Black Sea will start functioning on January 1, 2020. The extension which will pass through Bulgaria, Serbia and Hungary is expected to start functioning in stages. The first gas deliveries to Bulgaria are expected to be made in 2020. The pipeline will have the capacity to transfer 15.75 billion cubic meters of gas per year.
On Monday there will be snow showers or a mix of rain and snow in many places. The precipitation will decrease and stop, and the clouds will clear in the evening. The minimum temperature will be minus 3°C, around minus 1°C in Sofia, and the maximum will..
After a fire destroyed the roof of the historic National High School of Applied Arts in Tryavna on Friday morning, students are taking a week-long emergency break. With the help of the fire brigade, civil protection teams and local businesses, the..
The large-scale inspection, carried out by the competent police structures of the National Police Directorate and the regional directorates of the Interior Ministry, will continue next week to get the full picture - where, what and how many are the..
Ways to improve the positions of the sides to the contract between Bulgaria’s Bulgargaz, Bulgartransgaz and Türkiye’s BOTAŞ will be discussed until..
A wave of outrage is sweeping over Bulgaria after a severe accident on the Telish-Radomirtsi road (Pleven region), in which 12-year old Siyana lost her..
Over the next 24 hours the weather in the country will be dynamic. After temporarily dispersing, after midnight the clouds will increase and the..
+359 2 9336 661