The section of the 2-kilometer “Zheleznitsa” tunnel under construction on the Struma Highway, where rocks collapsed yesterday on three workers, is extremely complex in terms of terrain and land structure.
The high moisture from recent rains is the reason for the crumbling rock to fall on people. This was what the executive director of the contractor company, Stefan Totev, said. He pointed out that the inspection of several institutions and the contractor's experts did not reveal a technological or human error.
The condition of the three injured workers is stable and their lives are out of danger.
During the regional GERB youth academy in Targovishte, GERB leader Boyko Borissov stated that GERB would not sign the declaration of We Continue the Change/Democratic Bulgaria (PP/DB) for a cordon sanitaire around Delyan Peevski. PP/DB calls..
A protest took place in Velingrad in support of the farmers whose flocks of sheep have been quarantined because of positive tests for sheep and goat plague. To stop the spread of the disease, access to the area around the farms has been..
Bulgaria will be given six months to carry out the necessary reforms connected with the liberalisation of the energy market , otherwise it stands to lose EUR 653 million which it should receive as a second payment under the Recovery and..
The financial effect of our country's accession to Schengen by land will amount to BGN 1.63 billion (EUR 833.4 million) per year, according to a study..
The Ministry of Transport and Communications supports the idea of naming Sofia Airport after Vasil Levski– the most undisputed figure in Bulgarian..
On the occasion of World AIDS Day, observed on December 1, volunteers from the Bulgarian Red Cross Youth in Sofia will light tealights on the Lovers'..
+359 2 9336 661