North Macedonia is temporarily withdrawing from investment in Bulgaria's Belene nuclear power plant and focuses on the Greek gas plant in Alexandroupolis. This was what CEO of North Macedonia's state-owned electricity producer Elektrani, Vasko Kovacevski, told the energy forum in Skopje, BGNES reported.
He said that the Greek power plant had better chances of realization. "There have been several delays in the construction of Belene in Bulgaria. There are no prospect of this power plant starting operation, so we are focusing on other projects, in particular the combined gas plant in the industrial zone in Alexandroupolis, where we will have 25% ownership," Kovacevski added.
Over the next 24 hours the weather will continue cloudy, with rain mostly in the Southwestern half of the country and sleet in high plains. The precipitation over Mounts Rila and the Rhodopes will be considerable. There will be a moderate, in..
The Bulgarian Food Bank’s Kilogram of Kindness food drive, is collecting food for the needy for the 12th consecutive time. Four to seven tons of food with a longer shelf lifeis expected to be collected – such as rice, lentils,..
A Eurobarometer survey has registered the highest level of trust in the European Union since 2007 and the highest level of support ever for the common currency, the euro, both in the EU as a whole (74%) and in the euro area (81%). In Bulgaria,..
The financial effect of our country's accession to Schengen by land will amount to BGN 1.63 billion (EUR 833.4 million) per year, according to a study..
On Monday, the weather will continue cloudy in most parts of the country with rain, more significant in the southeastern regions. Light snow will fall..
"We demand the resignation of the management of the Bulgarian Food Safety Agency for failing to address the problems, specifically the case with the..
+359 2 9336 661