Podcast in English
Text size
Bulgarian National Radio © 2024 All Rights Reserved

Bulgaria hopes to have new nuclear power capacity within 10 years

Photo: Kozloduy NPP

The government has approved a report on the possibilities of building a new reactor on site 2 at Kozloduy NPP. The environment assessment has approved the technology of the American AP 1000 units and the Russian technologies for Belene NPP, Energy Minister Temenuzhka Petkova said. In the report, the experts support realization of Unit 7 at Kozloduy NPP with available equipment from the Belene NPP project.

"I think that after the 7thunit, we could go on to built 8th one," Prime Minister Boyko Borissov said, pointing out that the projects were in accordance with EU goals for climate neutrality by 2050 and diversification of energy resources. A model for financing of the new capacity is to be prepared, BTA reported.



Последвайте ни и в Google News Showcase, за да научите най-важното от деня!
Listen to the daily news from Bulgaria presented in "Bulgaria Today" podcast, available in Spotify.

More from category

GERB will not sign PP/DB’s declaration for a cordon sanitaire around Delyan Peevski, Boyko Borissov says

During the regional GERB youth academy in Targovishte, GERB leader Boyko Borissov stated that GERB would not sign the declaration of We Continue the Change/Democratic Bulgaria (PP/DB) for a cordon sanitaire around Delyan Peevski. PP/DB calls..

published on 11/30/24 3:17 PM

Protest in Velingrad in support of farmers with flocks which tested positive for sheep and goat plague

A protest took place in Velingrad in support of the farmers whose flocks of sheep have been quarantined because of positive tests for sheep and goat plague. To stop the spread of the disease, access to the area around the farms has been..

published on 11/30/24 1:10 PM

EC gives Bulgaria 6 months to introduce necessary reforms under the Recovery and Resilience Facility, or it may lose EUR 653 million

Bulgaria will be given six months to carry out the necessary reforms connected with the liberalisation of the energy market , otherwise it stands to lose EUR 653 million which it should receive as a second payment under the Recovery and..

published on 11/30/24 11:55 AM