The trade unions from the state-owned coal-fired power station Martitsa Iztok 2 warn that they will soon initiate protest and strike action to protect the functioning of the power plant.
In an open letter they express concern over the planned transfer of the power station to the free market entirely as the cost price of the electricity it produces is too high. According to the regulatory body the power plant’s selling price is 210 Leva /107 euro/ per Mwh which is 76% higher than the household electricity price, making the electricity produced by Martitsa Iztok 2 non-marketable. The trade unions say that unless steps are taken there is a risk that Martitsa Iztok 2 power station will stop working, leading to an electricity shortage in the region.
Reporting by Juliana Kornazheva, Horizont channel, BNR.
The first and most important goal is the adoption of the state budget. The second is the Recovery and Resilience Plan. The eurozone is a political issue and if we have a government, I believe we can move it forward and then go to elections, GERB..
Bulgaria’s President Rumen Radev handed the first cabinet-forming mandate to Rossen Zhelyazkov who is the prime minister-designate of the largest parliamentary group-GERB-SDS. Rossen Zhelyazkov announced the structure and composition of the cabinet,..
As of today, the price of electricity for household consumers will rise by an average of 1.7%, while the price of central heating and hot water will decrease by 8.5%, the Energy and Water Regulatory Commission said. The biggest increase in..
The enthronement of the newly elected Bulgarian Patriarch, Metropolitan Daniil of Vidin, is over. The new spiritual leader was welcomed in St...
It will be sunny on Monday. There will be light southeasterly wind in the eastern parts of the country. The hot weather continues with maximum..
"The faithful need the unity of the church, the unity of Orthodoxy; they need leadership for the spiritual rise of the Bulgarian people", President..
+359 2 9336 661