The quality of the Recovery and Resilience Plan is more important than the speed of payments, said Tsvetan Kyulanov, Head of the European Commission's Representation in Bulgaria.
In his words, the European Commission usually assesses the Member States’ recovery and resilience plans within two months after submission. Following the Commission, the Council approves the document within a period of one month, Tsvetan Kyulanov explained. Bulgaria can receive the first grant under the Recovery and Resilience Plan to the tune of 13% of the expected EUR 6 billion at the beginning of 2022 at the earliest, Tsvetan Kyulanov added.
The head of the European Commission’s Representation in Bulgaria refused to comment on the substance of the document because the European Commission has not yet become acquainted with it.
In September, Bulgaria was mentioned as a country connected with dangerous food 7 times, indicate data of the European Rapid Alert System for Food and Feed (RASFF), BNR’s Vesselina Milanova reports. Over the same period this country has reported..
The legal heirs of the people who lost their lives during the flooding in the region of Burgas at the beginning of October will receive 15,000 leva (EUR 7,670), the government has decided, BGNES reports. The 60,000 leva (EUR 30,679) needed has been..
The tendency of Bulgarians returning from abroad is permanent. This became apparent during the forum “Europe is with me”, organized by the Ministry of Labour and Social Policy’s Human Resources Development Programme, the Bulgarian news agency BTA..
On Tuesday , the lowest temperatures will be between 2 and 7°C. In the valleys and high fields the temperature can drop to minus 2°C;..
Bulgaria, Greece and Romania have finalized a memorandum for joint cooperation on new transport projects, said European Commissioner for..
In September, Bulgaria was mentioned as a country connected with dangerous food 7 times, indicate data of the European Rapid Alert System for Food and..
+359 2 9336 661