The planned annual repairs of Unit VI of Kozloduy NPP have been completed five days ahead of schedule. On November 1, at 1.41 am, it joined the country's energy system after an inspection and approval by the Nuclear Regulatory Agency.
The unit was stopped on September 29. For 31 days, the capacity of 1,000 megawatts was not part of the electricity market, which caused further rise of energy prices in Bulgaria.
Equipment maintenance has been performed and the unit has been refueled with fresh nuclear fuel. All the planned activities related to increasing the safety and ensuring the long-term operation of the unit have been carried out. The 5th nuclear power unit of Kozloduy is also operating at full capacity, the power plant's head Nasko Mihov said.
A meeting of the interior ministers of Bulgaria, Romania and Austria in Budapest could lead to a change in Austria's stance on the two countries joining the Schengen area. This is reported in the Austrian media. The meeting will take place on 22..
"I support the allocation of more funds in the field of innovation for defence" - this is how the Bulgarian candidate for the post of European Commissioner for Start-ups, Research and Innovation, Ekaterina Zaharieva, answered a question by Bulgarian MEP..
Vice President Iliana Iotova met with Mayor of Los Angeles Karen Bass. Iotova paid a visit to the American city on the occasion of the opening of the exhibition "Ancient Thrace and the Classical World. Treasures from Bulgaria, Romania..
2.5% is the necessary effort that our country must make in terms of defence spending, caretaker Minister of Defense Atanas Zapryanov..
Acting Energy Minister Vladimir Malinov told a briefing that neither he nor the Energy Ministry had any information about the sale of Lukoil Neftohim..
Metallurgy, heavy and mining industry are an irrevocable part of the full-fledged economic development of Europe. This was stated by Bulgarian President..
+359 2 9336 661