Bulgaria’s Ministry of Finance announced that an inspection conducted by Public Financial Inspection Agency found serious violations in the completion of Hemus motorway. A contract between the Road Infrastructure Agency and Avtomagistralli EAD for the completion of Lots 7, 8 and 9 of Hemus Motorway to the tune of EUR 690 million excluding VAT was subject to inspection.
The inspection found that the estimated prices were inflated by more than EUR 9 million. Prices for various materials and construction works on the above-mentioned lolts of the motorway were also inflated. The inspection also found that the Public Procurement Act had been circumvented during subcontracting of construction works by Avtomagistral EAD under 15 design contracts.
At the moment, there is no direct threat to our country stemming from the sharp deterioration of the security environment in the Middle East, President Rumen Radev announced after the three-hour meeting of the Consultative Council on..
We must be prepared for the worst-case scenario because the situation is escalating after Iran’s direct attack against Israel, said caretaker Minister of Defence Atanas Zapryanov for public service TV BNT. “We have response steps which is the next..
10,335 tons of roses have been produced in Bulgaria in 2024, almost 1,000 tons more than last year, the Consultative Council on Oil Bearing Roses says. There are almost 3,000 rose producers registered in the country, and 53 rose oil distilleries..
Charges of trading in influence are to be brought against Dzheyhan Ibryamov after decisions were made to strip him of his immunity from prosecution..
If the general elections were to be held at the beginning of October, 6 parties and coalitions would enter the Bulgarian parliament, a Market Links..
What is the noise level of an airplane engine or a hand drill, a normal conversation, the movement of a car at a speed of 60 km/h, in a disco, at a..
+359 2 9336 661