The Greece-Bulgaria gas interconnector has successfully been connected to Bulgaria’s national and transit gas transmission network.
According to the project company, connecting the infrastructure of the two independent transmission operators for Bulgaria - ICGB and Bulragtransgaz – was carried out between 16 and 17 August near Stara Zagora.
The interconnector is already successfully connected to the operators in the two neighbouring countries, and this means that the physical transmission of gas along the pipeline is technically provided for. After the mandatory non-destructive testing of the interconnector with the Bulgartransgaz network, the section will be buried. With this, all mechanical work will have been completed.
Traditionally, on the eve of the Easter holidays, the children from the "Tsar Simeon the Great" school in the village of Ivanyane near Sofia organised a charity bazaar with handmade souvenirs, sweets and drawings. They raised the..
Various events are held across the country hours before we welcome the Resurrection of Christ. In Sofia, the "It's Up to Us" Foundation invites children to a "Big Easter Egg Dyeing" from 11:00 to 15:00 at Canyon Park in Mladost 3..
Today, on Holy Saturday, which is the last day of Holy Week preceding Easter, Christians commemorate the burial of Jesus Christ and his descent into hell to break its chains and reopen the gates of heaven for people. The Divine..
Blind ultrarunner Victor Asenov has officially become part of the Everesting Hall of Fame, Sportal.bg reports. Between March 21 and 23, the..
Border Police remind that major repairs are underway on the Bulgarian section of the Danube Bridge in Ruse, and because of this, a temporary traffic..
On Friday, the minimum temperatures in Bulgaria will be from 7 to 12°C. In Sofia, it will be around 10°C. During the day, the cloudiness over the..
+359 2 9336 661