Despite the tensions arising from the tight deadlines, the government is making efforts so that the construction of the gas interconnector with Greece may be finished as soon as possible, caretaker Minister of Regional Development and Public Works Ivan Shishkov said, and added that all documents connected with the construction of the Bulgaria – Greece interconnector, carried out so far, should be received by the end of next week. Minister Shishkov expressed the hope that the construction work on the connection will be completed by mid-September, the more serious work remaining being that on the section in Haskovo region.
The National Assembly has introduced a new requirement for state-owned enterprises to implement corruption risk management systems, which will also include appointing an integrity officer. The measure is recommended by the Organisation for Economic..
GERB leader Boyko Borissov said that he did not like budget 2026 and it would be frozen. Speaking to the media in parliament, Borissov said that the Joint Governance Council of the formations in the government, the Prime Minister..
North Macedonian Prime Minister Hristijan Mickoski accused attacked Macedonian Bulgarian journalist Vladimir Perev of staging the attack and self-harm, BGNES has reported. On November 21, in a shop in the center of Skopje, Perev..
+359 2 9336 661