The gas interconnector between Bulgaria and Greece already has received a pre-operational license (Act 15) for the territory of Bulgaria, the project company "ICGB", which will be the operator of the gas pipeline, has announced. From there, they assured that the procedures for putting the gas interconnector into operation are progressing according to schedule and it will start commercial operation on October 1.
Two billion euros in additional state guarantees and a concession of the Bulgarian Sports Totalizator are part of changes to the draft budget for 2026, submitted between the first and second readings. The change that increases the..
The increase in the minimum wage is supported by 54.1% of Bulgarians. 1/3 of respondents believe that the minimum wage should be equal to the living wage. This is indicated by the results of a representative survey by the Myara..
“We see a rational plan for a quick peace from President Donald Trump, according to which the situation on the battlefield is developing extremely unfavorably for Ukraine, and he is trying to prevent a worse scenario and additional casualties,”..
Bulgaria will not have to bail out eurozone countries that are experiencing difficulties. This is what Lilyana Pavlova, former vice..
Bulgarian and Chinese researchers discussed scientific cooperation at a forum in Sofia on Friday, attended by representatives of the Bulgarian Academy of..
Bulgaria lacks a coherent national policy on refugees despite continued migrant flows , Vice President Iliana Iotova said on Wednesday, calling for a lead..
+359 2 9336 661