The sixth unit of the Kozloduy NPP has been reconnected to the country's energy system, the nuclear power plant reported.
During tests after scheduled maintenance work, the reactor was stopped on October 29 as a technical problem was found in the cooling system of the generator in the non-nuclear part of the unit. After eliminating the reasons that led to the shutdown, the teams of the nuclear power plant carried out the necessary tests according to the requirements for safe operation. The checks carried out confirm that all systems are working normally, experts announced
“I call on all representatives of the Movement for Rights and Freedoms in local government — mayors and municipal councilors — to ensure security and predictability for the people and to take the necessary steps to keep all local taxes and fees..
Bulgaria has climbed to 11th place in this year’s Digital Quality of Life 2025 (DQL) index published by Surfshark, up from 18th last year, BTA reported. The index evaluates countries’ digital well-being across five dimensions: fixed broadband..
Around 90% of the antiques seized during an international operation targeting a cultural property trafficking network will be returned to Bulgaria, Deputy Minister of Culture Todor Chobanov told “Nova TV”. “This is an unprecedented operation in..
+359 2 9336 661