Podcast in English
Text size
Bulgarian National Radio © 2025 All Rights Reserved

Unit 6 of Kozloduy NPP put back into operation

Photo: Radio Vidin

The sixth unit of the Kozloduy NPP has been reconnected to the country's energy system, the nuclear power plant reported.

During tests after scheduled maintenance work, the reactor was stopped on October 29 as a technical problem was found in the cooling system of the generator in the non-nuclear part of the unit. After eliminating the reasons that led to the shutdown, the teams of the nuclear power plant carried out the necessary tests according to the requirements for safe operation. The checks carried out confirm that all systems are working normally, experts announced




Последвайте ни и в Google News Showcase, за да научите най-важното от деня!
Listen to the daily news from Bulgaria presented in "Bulgaria Today" podcast, available in Spotify.

More from category

Prime Minister Rosen Zhelyazkov supports the peace plan for Ukraine

“Borders cannot be changed by force, and Ukraine’s long-term security must be guaranteed”, Bulgaria’s Premier Rossen Zhelyazkov said during a videoconference meeting of the “Coalition of the Willing”, led by French President Emmanuel Macron and UK..

published on 11/26/25 8:57 AM

Bulgaria and China discuss cooperation in the automotive sector

Business forum on the topic "Bulgaria - China: cooperation in the automotive sector" is being held on November 26 in Sofia. Its organizers are the Bulgarian Chamber of Commerce and Industry and the Embassy of the People's Republic of..

published on 11/26/25 7:30 AM

Draft budget 2026 sparks protests

The Bulgarian Industrial Capital Association has called for participation in a protest on November 26 against the budget for 2026, which is about to be adopted at second reading. "We call not only our members, but also all..

published on 11/26/25 6:50 AM