The sixth unit of the Kozloduy NPP has been reconnected to the country's energy system, the nuclear power plant reported.
During tests after scheduled maintenance work, the reactor was stopped on October 29 as a technical problem was found in the cooling system of the generator in the non-nuclear part of the unit. After eliminating the reasons that led to the shutdown, the teams of the nuclear power plant carried out the necessary tests according to the requirements for safe operation. The checks carried out confirm that all systems are working normally, experts announced
'The dialogue between employers and trade unions has been restored. Consultations will begin tomorrow at the Ministry of Finance to iron out all the details. The state is committed to supporting every Bulgarian citizen.' This was written by GERB leader..
Bulgarian citizens traveled abroad 829,300 times in October, which is 15% more than in October 2024 , according to the National Statistical Institute. The most popular destinations were Turkey, Greece, Serbia, Romania, Germany, North Macedonia,..
The National Assembly has introduced a new requirement for state-owned enterprises to implement corruption risk management systems, which will also include appointing an integrity officer. The measure is recommended by the Organisation for Economic..
+359 2 9336 661