A groundbreaking ceremony for a plant for the manufacture of photovoltaic panels and cells is to take place in the region of Stara Zagora by the end of this year. 15-20 hectares of land will be needed to build the plant and the investor has been working together with the municipality to provide the terrain needed. The new plant will create 350-500 jobs, and with the start of production of photovoltaic cells, their number will go up to 800.
Compiled by Yoan Kolev
Translated and posted by Milena Daynova
The procedure for renewable electricity storage projects under the National Recovery and Resilience Plan is now open and proposals are being accepted. There is a lot of money, the deadlines are short and the conditions applicants have to meet are not..
The European Bank for Reconstruction and Development (EBRD) has slightly lowered its growth forecasts for the regions in which it invests. Bulgaria's economy will grow by 2.9 per cent in 2025, 0.1 per cent less than initially forecast in May...
The largest net positive flows of direct investments in the country for January - July 2024 are from the Netherlands (269.5 million euros), Austria (225 million euros) and Greece (160.5 million euros), BNB data show. According to them, the..
On October 4, 1974, the construction of the Hemus Motorway from Sofia to Varna started. Back then, the chairman of the State Council and..
2024 is the best year since tourism statistics have been in existence – revenues, accommodation, number of tourists and tourist registrations, number of..
+359 2 9336 661