A groundbreaking ceremony for a plant for the manufacture of photovoltaic panels and cells is to take place in the region of Stara Zagora by the end of this year. 15-20 hectares of land will be needed to build the plant and the investor has been working together with the municipality to provide the terrain needed. The new plant will create 350-500 jobs, and with the start of production of photovoltaic cells, their number will go up to 800.
Compiled by Yoan Kolev
Translated and posted by Milena Daynova
In the next 12 months, the Bulgarian business needs about 262,000 workers and specialists , according to a study by the Employment Agency. This is nearly 9.3% of the currently employed. Compared to the results in 2023, there is a..
There will be pilot testing of ground-based silver iodide generators for hail protection in two zones where the use of rockets is not allowed, the Deputy Minister of Agriculture Ivan Kapitanov said. At a meeting with Claude Berthet,..
The German economy has been shrinking and the government expects a decline of 0.2% of GDP. Some of the main reasons for this include unresolved structural problems related to lack of energy security, excessive bureaucracy and shortage..
+359 2 9336 661