After a long debate, the National Assembly decided that Kozloduy NPP- New Builds and Hyundai Engineering & Construction hold negotiations by April 15. Hyundai was shortlisted as a potential contractor for the engineering, construction and commissioning of Units 7 and 8 at Kozloduy NPP, using Westingouse’s AP 1000 technology.
After a re-vote, the decision was adopted with 112 votes in favour, 29 against and 82 abstentions. With 52 votes in favour, 161 against and 8 abstentions, the parliament rejected another draft decision submitted by "We Continue the Change-Democratic Bulgaria" to hold parallel negotiations with Hyundai and the American company Bechtel.
"Flower in a Test Tube" is an innovative project that creates a new product using plant biotechnology. But it does more than that—it tells a story about the power of the human mind and heart. The idea comes from Petar Neftelimov, a young man born with..
The annual growth of incomes outpaced that of expenses in 2024. According to data from the National Statistical Institute, in 2024 the average annual total income per household member in Bulgaria reached 12,857 BGN (6,573.68 EUR) and increased by 18.5%..
The pig meat sector in Bulgaria is showing signs of growth. This was announced at the International Forum "Modern Trends in Pig Farming: Scientific, Market and Regulatory Aspects", held today in Stara Zagora. It was highlighted that 53% of the..
+359 2 9336 661