After a long debate, the National Assembly decided that Kozloduy NPP- New Builds and Hyundai Engineering & Construction hold negotiations by April 15. Hyundai was shortlisted as a potential contractor for the engineering, construction and commissioning of Units 7 and 8 at Kozloduy NPP, using Westingouse’s AP 1000 technology.
After a re-vote, the decision was adopted with 112 votes in favour, 29 against and 82 abstentions. With 52 votes in favour, 161 against and 8 abstentions, the parliament rejected another draft decision submitted by "We Continue the Change-Democratic Bulgaria" to hold parallel negotiations with Hyundai and the American company Bechtel.
The final price proposed by Bulgargaz for the sale of natural gas to its customers in October is BGN 63.72 (EUR 32.58) per megawatt-hour before tax. The 3% price increase is expected to be approved by the Energy Regulatory Commission. The October price..
T he LNG terminal near the Greek town of Alexandroupolis has officially srarted commercial operations today, the Greek company Gastrade announced. The facility features state-of-the-art technology with a maximum regasification capacity of 5.5 billion..
In September, the overall Business Climate Indicator for the country decreased by 1 point compared to August. The decline reflects a less favourable assessment in the industry sector, where the indicator fell by 5.2 points. Managers in industry reported..
On October 4, 1974, the construction of the Hemus Motorway from Sofia to Varna started. Back then, the chairman of the State Council and..
2024 is the best year since tourism statistics have been in existence – revenues, accommodation, number of tourists and tourist registrations, number of..
+359 2 9336 661