The transition from Russian nuclear fuel from "TVEL" to the American fuel from "Westinghouse" will start in May with the loading of 43 cartridges in the reactor core of the fifth unit of the Kozloduy NPP. The process of replacing the cartridges will last 4 years. This was announced at a briefing by the chair of the Nuclear Regulatory Agency, Tsanko Bachiyski, quoted by BTA.
The executive director of Kozloduy NPP, Valentin Nikolov, recalled that the process of preparation for switching to Westinghouse fuel began in 2019 with the signing of a contract with the company. According to him, during the entire period, control was also carried out over the production process of assembling the nuclear fuel.
As an EU member state and a NATO ally, Bulgaria is an active participant in solidarity initiatives aimed at strengthening our deterrence and defense capabilities, Prime Minister Rosen Zhelyazkov said in his speech at the Antalya Diplomacy..
The parliament adopted on second reading amendments to the Electronic Communications Networks and Physical Infrastructure Act. The aim is to shorten the terms for issuing documents for construction and putting digital technologies..
The average social security income for the country for February 2025 is 888.63 EUR, the National Social Security Institute (NSSI) has reported. Compared to the previous month, there is a rise of 2.42 EUR. In the period March 1,..
Energy Minister Zhecho Stankov attended the tenth edition of the Delphi Economic Forum in Greece. "Bulgaria is a reliable partner in the region's energy..
Sofia public transport workers will protest on Monday, April 14, demanding increase in wages . The decision to protest was made after meetings between the..
Testing of the sectional average speed control system began today. The tests are being conducted by the National Toll Authority in cooperation with the..
+359 2 9336 661