The transition from Russian nuclear fuel from "TVEL" to the American fuel from "Westinghouse" will start in May with the loading of 43 cartridges in the reactor core of the fifth unit of the Kozloduy NPP. The process of replacing the cartridges will last 4 years. This was announced at a briefing by the chair of the Nuclear Regulatory Agency, Tsanko Bachiyski, quoted by BTA.
The executive director of Kozloduy NPP, Valentin Nikolov, recalled that the process of preparation for switching to Westinghouse fuel began in 2019 with the signing of a contract with the company. According to him, during the entire period, control was also carried out over the production process of assembling the nuclear fuel.
The Bulgarian Council of Ministers has not discussed the hypothesis of Bulgaria's possible participation in peacekeeping forces in Ukraine. This was stated to the media by Deputy Prime Minister and Chairman of the Bulgarian Socialist Party (BSP) Atanas..
As Commander-in-Chief of the Bulgarian Armed Forces, I firmly oppose sending troops to Ukraine in any form, said President Rumen Radev during a celebration of the 35th anniversary of the establisment of the Confederation of Independent Trade Unions in..
We are working with the INSAIT Institute in Sofia. If they approve our project, in 2026 we will build an AI factory, Petar Statev from the Supervisory Board at Sofia Tech Park has told the Bulgarian National Radio. The..
The Bulgarian Ministry of Tourism will work to create a map of important, but hard-to-reach tourist and cultural-historical sites. The goal is then to..
Bulgarian Finance Minister Temenuzhka Petkova will travel to Brussels to provide an update on Bulgaria’s progress towards euro area accession. The..
Bulgaria’s President Rumen Radev named Sofia Airport after the Apostle of Freedom Vasil Levski, the press secretariat of the head of state announced...
+359 2 9336 661