In the next 10 years, more than 19,000 megawatts of new capacities will be built in Bulgaria, as 90% of them will use renewable energy sources such as the sun, wind and water, according to the ten-year plan for the development of the transmission electricity network of the Electricity System Operator. 85 percent of the new RES capacities will be photovoltaic plants.
The plan does not include new nuclear power capacities due to the complexity and long process of construction.
According to the Electricity System Operator, in the coming years the country, which is now a major exporter, will cover its consumption by importing electricity at a more competitive price.
Overnight it will be mostly clear. Winds will weaken and die down in many areas. In the morning it will be cold, with minimum temperatures between minus 7 and minus 2°C, reaching minus 10°C in the valleys and around minus 9°C in Sofia. Tomorrow will be..
The planned annual maintenance of Unit 6 of Bulgaria's only NPP, Kozloduy, has been completed. The unit was connected to the national grid at 10:07 following an inspection by the Nuclear Regulatory Agency. In addition to the repairs made to improve..
A quadripartite meeting of the interior ministers of Bulgaria, Hungary, Austria and Romania in Budapest on 22 November made it clear that Austria would lift its veto and that Bulgaria and Romania would probably become full members of Schengen from the..
“It’s time to lift internal border controls now,” European Commissioner for Home Affairs Ylva Johansson believes. In an interview with RFE/RL she..
The Constitutional Court has opened a case following the request by President Rumen Radev for the amendments to the Constitution, endorsed by the 49 th..
Romania and Bulgaria have a chance to join the Schengen area by land as of January 2025 , Hungarian Interior Minister Sándor Pinter said after an..
+359 2 9336 661