A second ship carrying pipes for the Vertical Gas Corridor project, which will connect Greece and Romania, has arrived at the Port of Burgas. Energy Minister Zhecho Stankov oversaw the delivery.
"These 2,526 pipes from India are intended for the next stage of construction of the Bulgarian section of the gas pipeline," Stankov stated. He added that the first 48-kilometre segment up to Kresna had been fully cleared, with some of the pipes already laid and welded. Construction is expected to be completed by the second quarter of 2026.
The next stage — 61 kilometres to Vetrino — will present a number of engineering challenges, including laying 30 kilometres of pipeline across the Stara Planina mountain range, traversing three rivers and drilling under the Hemus motorway.
This year, the team exploring the Provadia-Solnitsata archaeological complex is organizing an Open Day on September 22. A new visitor route has been prepared through the complex of the most ancient salt-producing and urban center in Europe...
In the summer of 2024, a Sofia municipality and its residents showed how we can be happy and united as a community, sitting at one table. In July 2024, on Exarch Yosif Street and in September on Oborishte Street in the Bulgarian capital Sofia, the first..
The Garlic Festival will be held on September 21 and 22 at the stadium in the village of Dolni Rakovets, Radomir Municipality, Pernik Region . The event presents the traditional production of Dolni Rakovets garlic. Due to the favorable soil..
On Saturday the lowest temperatures will be between 8 and 16°C; in some valleys – between 6° and 9°C, in Sofia – about 8°C. During..
The Garlic Festival will be held on September 21 and 22 at the stadium in the village of Dolni Rakovets, Radomir Municipality, Pernik Region . The..
In the summer of 2024, a Sofia municipality and its residents showed how we can be happy and united as a community, sitting at one table. In July 2024, on..
+359 2 9336 661