A second ship carrying pipes for the Vertical Gas Corridor project, which will connect Greece and Romania, has arrived at the Port of Burgas. Energy Minister Zhecho Stankov oversaw the delivery.
"These 2,526 pipes from India are intended for the next stage of construction of the Bulgarian section of the gas pipeline," Stankov stated. He added that the first 48-kilometre segment up to Kresna had been fully cleared, with some of the pipes already laid and welded. Construction is expected to be completed by the second quarter of 2026.
The next stage — 61 kilometres to Vetrino — will present a number of engineering challenges, including laying 30 kilometres of pipeline across the Stara Planina mountain range, traversing three rivers and drilling under the Hemus motorway.
Bulgaria is a factor in the EU and the region that North Macedonia must take into account, Minister of Foreign Affairs Georg Georgiev said in an interview with bTV regarding the report of the European Parliament from which references to “Macedonian..
The ministers of agriculture of Bulgaria, Hungary, Poland, Slovakia and Romania have signed a joint declaration concerning the agricultural aspects of the amended trade agreement between the EU and Ukraine, the Bulgarian Ministry of Agriculture..
Bulgaria reacted swiftly to a forest fire near the town of Kriva Palanka, North Macedonia, which is located near the Bulgarian -North Macedonian border. The fire, which broke out on Wednesday afternoon, spread rapidly and threatened the town itself,..
Sofia will now have night public transport connecting the centre with Vasil Levski Airport , according to the press centre of the Sofia Municipality...
A global leader in the production of robotic and minimally invasive surgical equipment has officially opened a new manufacturing facility in Parvomay ,..
“Prime Minister Hristijan Mickoski’s narrative will be left to those familiar with Aesop’s fables,” Bulgarian Prime Minister Rosen Zhelyazkov commented..
+359 2 9336 661