A second ship carrying pipes for the Vertical Gas Corridor project, which will connect Greece and Romania, has arrived at the Port of Burgas. Energy Minister Zhecho Stankov oversaw the delivery.
"These 2,526 pipes from India are intended for the next stage of construction of the Bulgarian section of the gas pipeline," Stankov stated. He added that the first 48-kilometre segment up to Kresna had been fully cleared, with some of the pipes already laid and welded. Construction is expected to be completed by the second quarter of 2026.
The next stage — 61 kilometres to Vetrino — will present a number of engineering challenges, including laying 30 kilometres of pipeline across the Stara Planina mountain range, traversing three rivers and drilling under the Hemus motorway.
On Friday, the National Assembly will vote on a no-confidence motion against the cabinet of Prime Minister Rosen Zhelyazkov over ''failures in environmental and water policy''. The fourth no-confidence motion against the current government was tabled..
The Speaker of the Parliament of Albania, Elisa Spiropali, has arrived in Bulgaria for an official visit. The two-day visit is at the invitation of National Assembly Speaker Natalia Kiselova . Elisa Spiropali was welcomed at the airport by the..
Tuition fees at state universities should not exceed 75% of the expenses for the training. This was what MPs decided with amendments to the Higher Education Act adopted on Wednesday at first reading. It is expected that after the..
The ministers of agriculture of Bulgaria, Hungary, Poland, Slovakia and Romania have signed a joint declaration concerning the agricultural aspects of..
Bulgaria reacted swiftly to a forest fire near the town of Kriva Palanka, North Macedonia, which is located near the Bulgarian -North Macedonian border...
The Chairman of the Security Services Control Committee, Atanas Atanasov, has summoned its members to a meeting today. A day after..
+359 2 9336 661