The start of the construction of a new repository for long-term storage of low and intermediate-level radioactive waste near the Kozloduy nuclear power plant will be given today (August 29). The first sod will be turned at an official ceremony in the presence of ministers, MPs and representatives of the local authorities. The repository will function in the next 60 years. The first stage of the construction will cost nearly EUR 72 million. The money was granted gratuitously by the Kozloduy International Decommissioning Support Fund through the European Bank for Reconstruction and Development. The second and the third phase will cost less and the financing will be provided by the Kozloduy NPP.
On Wednesday , the lowest temperatures will be between 3 and 8°C. In the regions with strong wind it will be up to 10-12°C. In Sofia it will be around 4°C. In the western parts of the Danube Plain and the Upper Thracian Plain it will..
Following a series of fires in the Burgas area last summer, including one that destroyed homes in a local villa district, the Burgas municipality has acquired high-tech drones equipped with thermal cameras, night vision, and 3D imaging . The two..
Illegal migrants from Syria, Iraq and Iran have been discovered in Sofia, and ten members of an organised criminal group have been arrested , Deputy City Prosecutor Desislava Petrova told reporters. Two of those arrested have been charged as the..
+359 2 9336 661