The start of the construction of a new repository for long-term storage of low and intermediate-level radioactive waste near the Kozloduy nuclear power plant will be given today (August 29). The first sod will be turned at an official ceremony in the presence of ministers, MPs and representatives of the local authorities. The repository will function in the next 60 years. The first stage of the construction will cost nearly EUR 72 million. The money was granted gratuitously by the Kozloduy International Decommissioning Support Fund through the European Bank for Reconstruction and Development. The second and the third phase will cost less and the financing will be provided by the Kozloduy NPP.
According to the Bulgarian Embassy in Berlin, there is currently no information about Bulgarian citizens injured after the terrorist attack in the city of Magdeburg , in which a car rammed into a crowd at the city's Christmas market. The Embassy is in..
At the last moment, when the third expedition of Bulgaria's Antarctic research ship was supposed to leave for Antarctica in November, we received a letter that the money for the ship to return back has been redirected to grain producers. This meant that..
The Bulgarian Foreign Ministry has expressed its heartfelt condolences over the terrible tragedy at the Prečko School in Zagreb. "Our thoughts are with the people of Croatia," the ministry wrote on the X network. A child died on December 20, and..
12 settlements in Smolyan district are without electricity after the heavy snowfall yesterday. Settlements in the municipalities of Smolyan, Devin and..
This year, employers prefer to replace the 13th salary with Christmas events and bonuses. Less than 50% of companies in Bulgaria pay bonuses...
Long lines of trucks and cars have formed at the border with Turkiye, reported Nova TV. The line of trucks on the Maritsa motorway has reached..
+359 2 9336 661