The start of the construction of a new repository for long-term storage of low and intermediate-level radioactive waste near the Kozloduy nuclear power plant will be given today (August 29). The first sod will be turned at an official ceremony in the presence of ministers, MPs and representatives of the local authorities. The repository will function in the next 60 years. The first stage of the construction will cost nearly EUR 72 million. The money was granted gratuitously by the Kozloduy International Decommissioning Support Fund through the European Bank for Reconstruction and Development. The second and the third phase will cost less and the financing will be provided by the Kozloduy NPP.
Bulgarian MPs are discussing a third vote of no confidence in the government of Rosen Zhelyazkov, BTA reports. According to the initiators from Vazrazhdane, the cabinet has failed in its financial policy. “The cabinet is..
With a majority of 197 votes and eight “abstentions”, the MPs accepted the resignation of the former co-chairman of “We Continue the Change” Kiril Petkov as an MP. He took political responsibility for the corruption scandal in..
The authorities in Burgas are introducing a 35-kilometer security zone in the waters of the Burgas Bay, where waiting tankers will not be allowed, BTA reported. The measure is in response to growing public discontent over the strong..
Gorna Oryahovitsa is the largest non-district town in Northern Bulgaria. It is located near Bulgaria’s old capital, Veliko Tarnovo, and is an important..
A new lane for heavy trucks over 12 tons will be opened at the Danube Bridge in Ruse, announced Ruse Regional Governor Dragomir Draganov. The initiative..
On July 7, the Bulgarian National Bank (BNB) puts into circulation a silver commemorative coin titled "175 Years Since the Birth of Ivan Vazov", BNB..
+359 2 9336 661