The construction of the gas interconnector between Greece and Bulgaria will be completed by the end of 2020, Bulgaria’s Minister of Energy Temenuzhka Petkova specified at the Bulgarian National Assembly. The construction of this interconnector should end simultaneously with the construction of the Trans-Adriatic Pipeline. Thus, the contract between Bulgargaz and the Azerbaijani company SOCAR for the delivery of 1 billion cubic meters of gas from Shah Deniz gas field can be fulfilled, Minister Petkova added. We must complete the construction of the gas interconnector with Greece so at the end of 2020 we are able to receive these gas quantities from the Caspian region, Temenuzhka Petkova further said.
For the first time, the Bulgarian National Radio (BNR) is hosting the annual Public Broadcasters International conference . The conference brings together public media bosses and executives from 24 countries across five continents. The theme..
Bulgaria supports the start of EU accession negotiations with Ukraine and Moldova, said Bulgaria’s Minister of Foreign Affairs Georg Georgiev during the EU Foreign Affairs Council held in Luxembourg. European Commissioner for Enlargement Marta Kos..
President Rumen Radev has issued decrees appointing Bulgarian ambassadors to the Kingdom of Belgium, the Kingdom of the Netherlands and the Republic of Kazakhstan. The decrees were published in the State Gazette, reported BTA. Natalia Evgenieva..
In September, Bulgaria was mentioned as a country connected with dangerous food 7 times, indicate data of the European Rapid Alert System for Food and..
The legal heirs of the people who lost their lives during the flooding in the region of Burgas at the beginning of October will receive 15,000 leva (EUR..
The President of the “Renew Europe” group in the European Parliament, Valérie Hayer, called on the European Commission to urgently send a mission to..
+359 2 9336 661