The construction of the gas interconnector between Greece and Bulgaria will be completed by the end of 2020, Bulgaria’s Minister of Energy Temenuzhka Petkova specified at the Bulgarian National Assembly. The construction of this interconnector should end simultaneously with the construction of the Trans-Adriatic Pipeline. Thus, the contract between Bulgargaz and the Azerbaijani company SOCAR for the delivery of 1 billion cubic meters of gas from Shah Deniz gas field can be fulfilled, Minister Petkova added. We must complete the construction of the gas interconnector with Greece so at the end of 2020 we are able to receive these gas quantities from the Caspian region, Temenuzhka Petkova further said.
Bulgaria has received its fourth air ambulance helicopter. “The new aircraft will be based at the Georgi Benkovski Air Force Academy hangar in Dolna Mitropolia. From there, it will serve a wide regional area and make a significant contribution to the..
The Bulgarian National Radio will host the 2025 Public Broadcasters International (PBI) Annual Conference . The prestigious forum will be held from 20 to 22 October for the first time in the Bulgarian capital Sofia. The theme of the PBI..
Plamen Dimitrov, president of Bulgaria’s largest trade union, the Confederation of Independent Trade Unions in Bulgaria (CITUB), has warned of a potential shortfall of around 17–18 billion leva (EUR 8.7–9.2 billion) in next year’s draft budget...
In September, Bulgaria was mentioned as a country connected with dangerous food 7 times, indicate data of the European Rapid Alert System for Food and..
On Tuesday , the lowest temperatures will be between 2 and 7°C. In the valleys and high fields the temperature can drop to minus 2°C;..
The legal heirs of the people who lost their lives during the flooding in the region of Burgas at the beginning of October will receive 15,000 leva (EUR..
+359 2 9336 661