The construction of the gas interconnector between Greece and Bulgaria will be completed by the end of 2020, Bulgaria’s Minister of Energy Temenuzhka Petkova specified at the Bulgarian National Assembly. The construction of this interconnector should end simultaneously with the construction of the Trans-Adriatic Pipeline. Thus, the contract between Bulgargaz and the Azerbaijani company SOCAR for the delivery of 1 billion cubic meters of gas from Shah Deniz gas field can be fulfilled, Minister Petkova added. We must complete the construction of the gas interconnector with Greece so at the end of 2020 we are able to receive these gas quantities from the Caspian region, Temenuzhka Petkova further said.
On Saturday, minimum temperatures will range from 13 to 19 °C . In Sofia, it will be 15 °C. Sunny weather will prevail with temporary cloud cover increasing in the afternoon. Maximum temperatures will rise to between 28 and 33 °C. In the capital, it will..
A global leader in the production of robotic and minimally invasive surgical equipment has officially opened a new manufacturing facility in Parvomay , Plovdiv Province, as part of its planned expansion in Europe, BNR Plovdiv reports. The American..
'It is blatantly untrue that the contract with the Turkish state-owned company Botas is not being put into use." President Rumen Radev stated this to journalists at the Krumovo Air Base. The terminal in Alexandroupolis has not been operational..
+359 2 9336 661