The construction of the gas interconnector between Greece and Bulgaria will be completed by the end of 2020, Bulgaria’s Minister of Energy Temenuzhka Petkova specified at the Bulgarian National Assembly. The construction of this interconnector should end simultaneously with the construction of the Trans-Adriatic Pipeline. Thus, the contract between Bulgargaz and the Azerbaijani company SOCAR for the delivery of 1 billion cubic meters of gas from Shah Deniz gas field can be fulfilled, Minister Petkova added. We must complete the construction of the gas interconnector with Greece so at the end of 2020 we are able to receive these gas quantities from the Caspian region, Temenuzhka Petkova further said.
There is no democracy and freedom without freedom of speech and pluralism, said President Rumen Radev at the opening, in Sofia, of the annual Public Broadcasters International Conference. For the first time, the Bulgarian National Radio is playing..
A meeting of the coalition partners started early this morning, during a sitting of the National Assembly, to discuss the possible reformatting of the government. Such a change was first made mention of by GERB leader Boyko Borissov after his party..
For the first time, the Bulgarian National Radio (BNR) is hosting the annual Public Broadcasters International conference . The conference brings together public media bosses and executives from 24 countries across five continents. The theme..
On Tuesday , the lowest temperatures will be between 2 and 7°C. In the valleys and high fields the temperature can drop to minus 2°C;..
Bulgaria, Greece and Romania have finalized a memorandum for joint cooperation on new transport projects, said European Commissioner for..
The European Public Prosecutor’s Office has carried out searches in the Municipality of Plovdiv and in a company suspected of public..
+359 2 9336 661