The construction of the gas interconnector between Greece and Bulgaria will be completed by the end of 2020, Bulgaria’s Minister of Energy Temenuzhka Petkova specified at the Bulgarian National Assembly. The construction of this interconnector should end simultaneously with the construction of the Trans-Adriatic Pipeline. Thus, the contract between Bulgargaz and the Azerbaijani company SOCAR for the delivery of 1 billion cubic meters of gas from Shah Deniz gas field can be fulfilled, Minister Petkova added. We must complete the construction of the gas interconnector with Greece so at the end of 2020 we are able to receive these gas quantities from the Caspian region, Temenuzhka Petkova further said.
The Bulgarian Ministry of Defense has signed a contract with Polish state company Wojskowe Zakłady Lotnicze Nr 2 S.A. for major repair of six MiG-29 aircraft engines. The maximum period for carrying out the repair of each engine will be no more..
The chief of police in Petrich and two other police officers, arrested two days ago, are accused of participating in a criminal group. This was announced by Sofia city prosecutor Iliana Kirilova, BTA reported. According to Kirilova, the detained..
The Sofia City Prosecutor's Office has announced the release of Dzheyhan Ibryamov. He will be released from custody tomorrow, November 7, and the investigation against him on charges of influence peddling will be suspended at the moment he takes the..
2.5% is the necessary effort that our country must make in terms of defence spending, caretaker Minister of Defense Atanas Zapryanov..
Acting Energy Minister Vladimir Malinov told a briefing that neither he nor the Energy Ministry had any information about the sale of Lukoil Neftohim..
Metallurgy, heavy and mining industry are an irrevocable part of the full-fledged economic development of Europe. This was stated by Bulgarian President..
+359 2 9336 661