The construction of the gas interconnector between Greece and Bulgaria will be completed by the end of 2020, Bulgaria’s Minister of Energy Temenuzhka Petkova specified at the Bulgarian National Assembly. The construction of this interconnector should end simultaneously with the construction of the Trans-Adriatic Pipeline. Thus, the contract between Bulgargaz and the Azerbaijani company SOCAR for the delivery of 1 billion cubic meters of gas from Shah Deniz gas field can be fulfilled, Minister Petkova added. We must complete the construction of the gas interconnector with Greece so at the end of 2020 we are able to receive these gas quantities from the Caspian region, Temenuzhka Petkova further said.
“Podkrepa” begins a series of protest actions in key state administrations across the country, BGNES reports. The first of them is today at noon in front of the Central Office of the National Statistical Institute in Sofia and in..
The average life expectancy in Bulgaria has started to rise again and reaches 75.6 years, the government press service announced. The positive trend is mainly associated with the subsiding impact of the Covid-19 pandemic. The average..
The Bulgarian Ministry of Education and Science is organizing a national round table on 20 November on the topic “Are Restrictions Needed on Children’s Access to Social Networks?” The initiative is in cooperation with the parliamentary..
The Speaker of the National Assembly has no right to rule unilaterally on a national referendum. This becomes clear from a decision of the Constitutional..
At a meeting in Berlin with Google’s Vice President for Government Affairs and Public Policy for Europe Annette Kroeber-Riel, Minister of E-Government..
On Wednesday, minimum temperatures will range from 5°C to 10°C across the country, reaching 12°C to 17°C in southern Bulgaria and around 8°C in Sofia. It..
+359 2 9336 661