The construction of the gas interconnector between Greece and Bulgaria will be completed by the end of 2020, Bulgaria’s Minister of Energy Temenuzhka Petkova specified at the Bulgarian National Assembly. The construction of this interconnector should end simultaneously with the construction of the Trans-Adriatic Pipeline. Thus, the contract between Bulgargaz and the Azerbaijani company SOCAR for the delivery of 1 billion cubic meters of gas from Shah Deniz gas field can be fulfilled, Minister Petkova added. We must complete the construction of the gas interconnector with Greece so at the end of 2020 we are able to receive these gas quantities from the Caspian region, Temenuzhka Petkova further said.
The National Assembly has introduced a new requirement for state-owned enterprises to implement corruption risk management systems, which will also include appointing an integrity officer. The measure is recommended by the Organisation for Economic..
GERB leader Boyko Borissov said that he did not like budget 2026 and it would be frozen. Speaking to the media in parliament, Borissov said that the Joint Governance Council of the formations in the government, the Prime Minister..
North Macedonian Prime Minister Hristijan Mickoski accused attacked Macedonian Bulgarian journalist Vladimir Perev of staging the attack and self-harm, BGNES has reported. On November 21, in a shop in the center of Skopje, Perev..
+359 2 9336 661