The construction of the gas interconnector between Greece and Bulgaria will be completed by the end of 2020, Bulgaria’s Minister of Energy Temenuzhka Petkova specified at the Bulgarian National Assembly. The construction of this interconnector should end simultaneously with the construction of the Trans-Adriatic Pipeline. Thus, the contract between Bulgargaz and the Azerbaijani company SOCAR for the delivery of 1 billion cubic meters of gas from Shah Deniz gas field can be fulfilled, Minister Petkova added. We must complete the construction of the gas interconnector with Greece so at the end of 2020 we are able to receive these gas quantities from the Caspian region, Temenuzhka Petkova further said.
The Deputy Speaker of the Parliament of North Macedonia, Vesna Bendevska, has reported to the Prosecutor's Office in Bitola that the Bulgarian cultural club "Ivan Mihailov" in the city continues to function, despite its deletion from..
A meeting of representatives from four clubs of the Macedonian Patriotic Organization (MPO) in the USA and Canada, took place in Indianapolis. The meeting included the clubs of "Pirin" (Chicago), "Bistrica" (Cincinnati), "Todor..
Before the start of a ceremony in Sofia for presenting the "Manager of the Year" awards, President Rumen Radev announced that he will convene the 51st National Assembly on November 11. Asked whether he would approach the..
2.5% is the necessary effort that our country must make in terms of defence spending, caretaker Minister of Defense Atanas Zapryanov..
Acting Energy Minister Vladimir Malinov told a briefing that neither he nor the Energy Ministry had any information about the sale of Lukoil Neftohim..
The Bulgarian Ministry of Defense has signed a contract with Polish state company Wojskowe Zakłady Lotnicze Nr 2 S.A. for major repair of six MiG-29..
+359 2 9336 661