An association with lead partner Glavbolgarstroy will have the right to build the section of Struma motorway across Kresna Gorge, the Road Infrastructure Agency has announced.
The cost will be 475 million Leva, VAT excluded. With indirect tax the sum will run to almost 55 million Leva (a little over 28 million euro) per kilometer. This makes the section from Krupnik to Kresna, which is 10.4 kilometers long, the most expensive road section ever built in Bulgaria, BNR’s Marta Mladenova reports. The deadline for the implementation of the project is 4 years 2 months.
The company Glavbolgarstroy was set up more than 50 years ago, and is the first to have developed basic standards in Bulgaria’s contemporary construction industry.
The second F-16 fighter jet is expected to arrive in Bulgaria within days, said Defense Minister Atanas Zapryanov during a lecture to students at the University of Library Studies and Information Technologies. PM Rosen Zhelyazkov: The first..
Bulgaria’s President Rumen Radev discussed ways to boost trade and investment between Bulgaria and Poland during a meeting with representatives of the Polish-Bulgarian Chamber of Commerce. On the first day of his visit to Warsaw, President..
Military units of the Land Forces will welcome visitors on the occasion of May 6 - the Day of Valour and the Day of the Bulgarian Army, the Ministry of Defence announced. Visitors will have the opportunity to see exhibitions of weapons, military..
A month after Bulgaria receives the green light to join the eurozone, all traders are obliged to have their prices in both Bulgarian..
Since the beginning of the year, Bulgaria has also met the price stability criterion for eurozone membership, Minister of Finance..
On Tuesday, the lowest temperatures will range from 1°C to 6°C, for Sofia around 5°C. There will be frost in some valleys across eight regions in..
+359 2 9336 661