An association with lead partner Glavbolgarstroy will have the right to build the section of Struma motorway across Kresna Gorge, the Road Infrastructure Agency has announced.
The cost will be 475 million Leva, VAT excluded. With indirect tax the sum will run to almost 55 million Leva (a little over 28 million euro) per kilometer. This makes the section from Krupnik to Kresna, which is 10.4 kilometers long, the most expensive road section ever built in Bulgaria, BNR’s Marta Mladenova reports. The deadline for the implementation of the project is 4 years 2 months.
The company Glavbolgarstroy was set up more than 50 years ago, and is the first to have developed basic standards in Bulgaria’s contemporary construction industry.
The Bulgarian National Bank is issuing a new silver commemorative coin from the “Bulgarian National Revival” series , the institution announced today. This time the coin is on the theme of “175 years since the birth of Zahari Stoyanov”. The..
On Monday it will be mostly sunny, over the mountainous regions – with insignificant cumulus clouds. A light to moderate wind will blow from the east-northeast. The minimum temperatures will be between 1°C and 6°C, and the maximum – between..
The former leader of the Bulgarian Socialist Party, Kornelia Ninova, has founded her own party under the name "Unyielding Bulgaria." The goal of the formation is to offer an alternative to the current ruling model. "We cannot accept the..
A month after Bulgaria receives the green light to join the eurozone, all traders are obliged to have their prices in both Bulgarian..
Since the beginning of the year, Bulgaria has also met the price stability criterion for eurozone membership, Minister of Finance..
On Tuesday, the lowest temperatures will range from 1°C to 6°C, for Sofia around 5°C. There will be frost in some valleys across eight regions in..
+359 2 9336 661