An association with lead partner Glavbolgarstroy will have the right to build the section of Struma motorway across Kresna Gorge, the Road Infrastructure Agency has announced.
The cost will be 475 million Leva, VAT excluded. With indirect tax the sum will run to almost 55 million Leva (a little over 28 million euro) per kilometer. This makes the section from Krupnik to Kresna, which is 10.4 kilometers long, the most expensive road section ever built in Bulgaria, BNR’s Marta Mladenova reports. The deadline for the implementation of the project is 4 years 2 months.
The company Glavbolgarstroy was set up more than 50 years ago, and is the first to have developed basic standards in Bulgaria’s contemporary construction industry.
For two decades Bulgaria has known what it is striving for, Prime Minister Rosen Zhelyazkov said after a meeting with President of the European Council António Costa, who arrived on a three-day visit to Bulgaria. Zhelyazkov pointed..
Bulgarian President Rumen Radev begins his two-day visit to Warsaw at the invitation of his counterpart Andrzej Duda. In the Polish capital, he will participate in the 10th Summit of the “Three Seas” initiative to deepen cooperation in the energy,..
The Bulgarian National Bank is issuing a new silver commemorative coin from the “Bulgarian National Revival” series , the institution announced today. This time the coin is on the theme of “175 years since the birth of Zahari Stoyanov”. The..
Bulgaria’s President Rumen Radev discussed ways to boost trade and investment between Bulgaria and Poland during a meeting with representatives of..
Since the beginning of the year, Bulgaria has also met the price stability criterion for eurozone membership, Minister of Finance..
A month after Bulgaria receives the green light to join the eurozone, all traders are obliged to have their prices in both Bulgarian..
+359 2 9336 661