An association with lead partner Glavbolgarstroy will have the right to build the section of Struma motorway across Kresna Gorge, the Road Infrastructure Agency has announced.
The cost will be 475 million Leva, VAT excluded. With indirect tax the sum will run to almost 55 million Leva (a little over 28 million euro) per kilometer. This makes the section from Krupnik to Kresna, which is 10.4 kilometers long, the most expensive road section ever built in Bulgaria, BNR’s Marta Mladenova reports. The deadline for the implementation of the project is 4 years 2 months.
The company Glavbolgarstroy was set up more than 50 years ago, and is the first to have developed basic standards in Bulgaria’s contemporary construction industry.
Bulgarian MPs are meeting today for the seventh time in an attempt to elect a speaker of the 51st National Assembly after the first six failed to produce a result. This is how the first session of the new parliament, which began on November 11, continues..
The Real Estate Business Forum "Standards of the Future in Our Living Environment" will bring together experts in Sofia today. The focus of the discussions will be on the real estate market in the Bulgarian capital and the region. An analysis of..
Overnight it will be clear. The wind will die down in most areas. After midnight along the Danube River, in lowlands and near rivers fogs will form and visibility will be reduced with low clouds. Minimum temperatures will be between minus 3°C and 2°C,..
The U.S. Department of State today released the data for the refused type B visas for the financial year 2024. For Bulgaria, this percentage is 6.02%,..
The Bulgarian Hotel and Restaurant Association (BHRA) presented its annual awards for professional achievements in the field of tourism. The Bulgarian..
At the opening of a business forum in Ho Chi Minh City during his official visit to Vietnam, Bulgarian President Rumen Radev pointed out that Bulgaria..
+359 2 9336 661