“The Greece-Bulgaria interconnector should be ready by the end of 2021 so that liquefied gas can flow through it from Alexandroupolis - American, Israeli, Egyptian, from many sources. In future its capacity can be increased to 5 billion cubic metres of gas a year,” said Prime Minister Boyko Borissov who conducted an inspection of the construction work.
The project is important for Bulgaria and for the region because if affords the possibility of diversifying natural gas supply sources, the government press service states.
At this time pipes have been distributed along the 150-km. track in preparation of subsequent activity, along 70 kilometres the pipes have been laid in trenches. The pipeline is 182 kilometres long, 150 of which on Bulgarian territory.
Bulgaria’s GDP is expected to grow 3% this year, the European Commission said in its Autumn Economic Forecast, as reported by BTA. The projection marks an upgrade from the 2% growth rate estimated in the Commission’s spring outlook. The expected GDP..
Bulgaria has no additional conditions from the United States for the exception of the sanctions imposed on Lukoil to enter into force, Minister of Energy Zhecho Stankov told BNT. If necessary, the postponement of the sanctions against Lukoil can be..
In 2026, Bulgaria will assume the presidency of the EU Strategy for the Danube Region for the second time. The symbolic handover of the presidency took place during the 14 th Annual Forum of the EU Strategy for the Danube Region (EUSDR) held in..
Bulgaria’s GDP is expected to grow 3% this year, the European Commission said in its Autumn Economic Forecast, as reported by BTA. The projection marks..
On Tuesday, overnight lows will range from 7°C to 12°C, rising to 12–16°C in eastern Bulgaria and around 9°C in Sofia. It will be a cloudy day with rain,..
The European Commission has approved 70 projects across the EU , worth more than €600 million , to support alternative fuels and reduce vehicle..
+359 2 9336 661